Skip to main content
A Hunza Global Ventures Company
Home›Services›Professional Installation
Install

Professional Installation

Plumbed-in systems, installed properly

Bottle-free systems connect directly to your building supply. Our installation process covers water-line connection, drainage where required, equipment configuration, initial flushing and commissioning, and a walkthrough so your team knows how the system operates.

Professional Installation environment
When you need it

Key requirements

  • Connecting dispensers to the water line
  • Coordinating with facilities or contractors
  • Minimal disruption to operations
  • Confidence the system is set up correctly
Our approach

How we deliver

01

Pre-install check

Confirm connections, power and placement.

02

Installation

Connect, configure and flush the system.

03

Commissioning

Performance check and user walkthrough.

What's included
Water-line connection
Equipment setup
Flushing & commissioning
Staff walkthrough

Equipment, certifications and service availability are confirmed per site during assessment.

In more detail

Professional Installation: what to know

How a plumbed-in installation works

Point-of-use dispensers and refill stations connect to a cold-water line, often with a small valve and filtered feed. Some models also need a drain or an electrical outlet. Before installation we confirm each connection, the placement and any access you need to arrange with your facilities team or landlord.

On installation day

Our team connects and configures the equipment, flushes the system and checks it is working as it should. We then walk your team through daily use, such as how to dispense, what the indicator lights mean and who to call if something looks wrong.

After installation

Once installed, a maintenance agreement or leased system management plan keeps filters and sanitation on schedule. You can also call us for any service need.

Common questions
How long does installation take?

Most single-point installations are completed in one visit. Larger or multi-site projects are scheduled in stages; we give you a timeline with the quote.

Do we need to arrange a plumber?

No, connection to the water line is part of our installation. If building work is needed beyond that, we tell you during the assessment.

Will the water be ready to drink straight away?

The system is flushed and checked during commissioning before handover.